Project Forecast

ProjectsDivisionBranchFund SourceProject SizeSolicitation TypeCalendar Year
Alley Restoration CitywideOPS MDAssetLocalScope 5Construction2024/3rd
Local Sidewalk Restoration CitywideOPS MDAssetLocalScope 3Construction Management2024/3rd
Local Pavement Restoration CitywideOPS MDAssetLocalScope 3Construction
Management
2024/3rd
Federal Aid Pavement Restoration STBGOPS MDAssetCapital/FederalScope 3Construction Management2024/2nd
Federal Aid Pavement Restoration STBGOPS MDAssetCapital/FederalScope 5Construction2024/1st
Local Sidewalk Restoration CitywideOPS MDAssetLocalScope 5Construction2024/1st
Local Pavement Restoration CitywideOPS MDAssetLocalScope 5Construction2024/1st
Tunnel Technical Support ServiceOPS MDAssetFederalScope 5Construction Management2025/1st
Operation and Maintenance of Movable Barrier SystemOPS MDAssetFederalScope 4Construction2024/3rd
Tunnel Maintenance ServiceOPS MDAssetFederalScope 5Construction
FY20 Pavement Restoration NHPP StreetsOPS MDAssetCapital/FederalScope 5Construction
FY20 Pavement Restoration NHPP StreetsOPS MDAssetCapital/FederalScope 3Construction Management
Replacing and Upgrading Damaged Guiderail and Impact AttenuatorsOPS MDAssetFederalScope 5Construction
Replacing and Upgrading Damaged Guiderail and Impact AttenuatorsOPS MDAssetFederalScope 2Construction Management
Arizona Ave to CCT ConnectorPSDATBLocalScope 2Design
Bicycle and Pedestrian Design ContractPSDATBLocalScope 3Design
Suitland Parkway Trail DesignPSDATBLocalScope 2Design
11th St Bridge ParkIPMAAWILocalScope 5Construction2026/1st
11th St Bridge ParkIPMAAWILocalScope 4Construction Management2026/1st
Pedestrian Bridge over Arizona Ave and connecting trailsIPMABCBFederalScope 4Construction2026/1st
Pedestrian Bridge over Arizona Ave and connecting trailsIPMABCBFederalScope 3Construction Management2026/1st
Canal Rd slope stabilization at Clark Pl and Georgetown UniversityIPMABCBFederalScope 4Construction2026/1st
Canal Rd slope stabilization at Clark Pl and Georgetown UniversityIPMABCBFederalScope 3Construction Management2026/1st
Standpipes for 9th Street Tunnel and 12th Street TunnelIPMABDBFederalScope 3Design2025/4th
10th Street Bridge SW over CSXIPMABDBFederalScope 3Design2025/4th
SB Kenilworth Avenue NEIPMABCBFederal/LocalScope 3Construction2025/3rd
SB Kenilworth Avenue NEIPMABCBFederal/LocalScope 2Construction Management2025/3rd
Rehabilitation of I-395 Northbound Bridge over the Potomac RiverIPMABCBFederalScope 4Construction Management2026/2nd
Rehabilitation of Whitehurst Freeway BridgeIPMABDBFederalScope 3Design2025/3rd
Arboretum Bridge and Trail – ConstructionIPMABCBFederalScope 4Construction2026/1st
Arboretum Bridge and TrailIPMABCBFederalScope 3Construction Management2026/1st
Rehabilitation of I-395 Northbound Bridge over the Potomac RiverIPMABCBFederalScope 5Design/Build2025/4th
Kenilworth Terrace over Watts Branch (Bridge 47)IPMACESPFederalScope 4Construction2026/3rd
Kenilworth Terrace over Watts Branch(Bridge 47)IPMACESPFederalScope 3Construction Management2026/3rd
Anacostia Ave over Anacostia River Outlet (Bridge 78)IPMACESPFederalScope 4Construction2025/4th
Anacostia Ave over Anacostia River Outlet (Bridge 78)IPMACESPFederalScopeConstruction Management2025/4th
South Capital Street Corridor Phase I - West EsplanadeIPMACESPFederalScope 3Construction2025/3rd
South Capitol Street TrailIPMACESPFederalScope 5Construction2026/2nd 
South Capitol Street TrailIPMA

CESP

FederalScope 3Construction Management2026/2nd
Eastern Ave from New Hampshire Ave NE to Whittier St NWIPMARCBFederalScope 4Construction2026/1st
Eastern Ave from New Hampshire Ave NE to Whittier St NWIPMARCBFederalScope 3Construction Management2026/1st
Wheeler Rd Safety Project from Alabama Ave to Southern AveIPMARCBLocalScope 5Construction2025/4th
Wheeler Rd Safety Project from Alabama Ave to Southern AveIPMARCBLocalScope 3Construction Management2025/4th
Met Branch Trail from Blair to Piney Branch RdIPMARCBLocalScope 4Construction2025/4th
Met Branch Trail from Blair to Piney Branch RdIPMARCBLocalScope 3Construction Management2025/4th
Southern Avenue Phase 1IPMARCBFederalScope 2Construction Management2025/4th
Southern Avenue Phase 1IPMARCBFederalScope 3Construction2025/4th
Benning Road Bridges and Transportation ProjectIPMABCBFederal/LocalScope 5Construction2025/4th
Benning Road Bridges and Transportation ProjectIPMABCBFederal/LocalScope 5Construction Management2025/4th
Aspen St. from 16th St to Georgia AveIPMARCBFederal/LocalScope 5Construction2025/4th
Aspen St. from 16th St to Georgia AveIPMARCBFederal/LocalScope 3Construction Management2025/4th
Martin Luther King Jr Ave 2IPMARCBLocalScope 3Construction Management2026/3rd
Martin Luther King Jr Ave 2IPMARCBLocalScope 5Construction2026/3rd
East Capitol Street Geometric and Safety ImprovementsIPMARCBFederal/LocalScope 5Construction2026/2nd
East Capitol Street Geometric and Safety ImprovementsIPMARCBFederal/LocalScope 3Construction management2026/2nd
DC-295 Mid-term safety improvements IPMARDBFederalScope 3Design2025/3rd
Citywide Traffic Safety ConstructionTESDCWFederalScope 3Construction
Citywide Traffic Signal ConstructionTESDCWFederalScope 3Construction
DC PLUG Feeder 00347IPMADC PLUGLocalScope 4Construction2026/1st
DC PLUG Feeder 00075IPMADC PLUGLocalScope 4Construction2026/4th
DC PLUG Feeder 15174IPMADC PLUGLocalScope 5Construction2026/2nd
DC PLUG Feeder 14767IPMADC PLUGLocalScope 5Construction2026/3rd
DC PLUG Feeder 14009IPMADC PLUGLocalScope 5Construction2026/2nd
DC PLUG Feeder 00467IPMADC PLUGLocalScope 4Construction2025/3rd
DC PLUG Feeder 15171IPMADC PLUGLocalScope 4Construction2025/3rd
DC PLUG Feeder 14007IPMADC PLUGLocalScope 5Construction2025/3rd
Traffic Sign Inventory UpgradeOPSFOBFederalScope 1Design
Multimodal Curbside Asset ManagementOPSPark & CurbLocalScope 5Design/Construction
Alabama Avenue Concept and Preliminary DesignPSDPPFederalScope 3Design
Martin Luther King Jr SE/Good Hope Road/Reconnect the GridPSDPPLocalScope 3Design
New York Avenue Streetscape and ReconstructionPSDPPFederalScope 2Design
Tenleytown Multimodal AccessPSDPPFederal/LocalScope 2Design











































































































































































































CM Highway Structures Preventive  Maintenance and Emergency RepairsIPMA

SIRE

FederalScope 3Construction Management2025/2nd
Highway Structures Preventive Maintenance and Emergency RepairsIPMASIREFederalScope 5Construction/IDIQ2028/4th
Consultant Bridge DesignIPMASIREFederalScope 3Design/IDIQ2025/2nd
Bridge Management Program (BrM AASHTOWare)IPMASIREFederalScope 1Sole Source
Consultant Bridge InspectionIPMASIREFederalScope 3Design/IDIQ2028/1st
Bridge #1016 (NB) & 1206 UHPC overlayIPMASIREFederal Scope 3Construction 2025/3rd







goDCgoPSDSTPFederal CMAQScope 3Open Market
Oversize/Overweight Routing Tool Maintenance and EnhancementPSDSTPFederal FreightScope 1Sole Source
Positive Truck Route SignagePSDSTPFederal FreightScope 1Planning or Design
State Freight Plan UpdatePSDSTPFederal FreightScope 1Planning







ITS MaintenanceOPS ITSTraffic SignalsFederalScope 3Construction
Construction of Fiber Communication Networks on CorridorsOPS ITSTOSDFederalScope 3Construction





















Green Infrastructure Maintenance/LandscapingOPSUFDLocalScope 1Construction
Tree PlantingOPSUFDFederal/LocalScope 3Construction
































































KEY FUND TYPES

Scope 1
Lesser – $500K
Scope 2
$500K – $1M
Scope 3
$1M – $5M
Scope 4
$5M – $10
Scope 5
$10M – Greater